When we left off last time, I was getting ready to start to build the wall (goldenrod colour line from previous post). Well shortly after that started, my GC showed up to install my doors that were replacing a man door and a garage door.
Well, the wall was built and walls along the exposed foundation were also built and insulated in the mechanical side (left side of drawing). I am now waiting on the electrician to come and move a couple lines and then the stairs to the basement can get replaced and that wall of cement insulated In the meantime, the royal WE decided that the paneling leading to the basement along the stairs needed to be removed. Guess what!? That paneling is glued to the 1/2″ of plaster which is on top of 1/2″ gyproc. Too bad the royal WE wouldn’t lend a hand in this.