The continuing stooory of my basement Part 2

When we left off last time, I was getting ready to start to build the wall (goldenrod colour line from previous post). Well shortly after that started, my GC showed up to install my doors that were replacing a man door and a garage door.

Door at top of stairs to basement


Door that replaced garage door in the basement

Well, the wall was built and walls along the exposed foundation were also built and insulated in the mechanical side (left side of drawing). I am now waiting on the electrician to come and move a couple lines and then the stairs to the basement can get replaced and that wall of cement insulated In the meantime, the royal WE decided that the paneling leading to the basement along the stairs needed to be removed. Guess what!? That paneling is glued to the 1/2″ of plaster which is on top of 1/2″ gyproc. Too bad the royal WE wouldn’t lend a hand in this.

Advertisement

One Response to “The continuing stooory of my basement Part 2”

  1. Allan Says:

    “The Royal WE”!!!!! I like it!!!!!!! Great job Ric

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Connecting to %s


Follow

Get every new post delivered to your Inbox.